TW-F7210OEM / ODM available
Arc floor lamp with marble base
A two-metre arc over a sofa, balanced on a slab of marble.
- Minimum order
- 100 pcs
- Lead time
- 35–40 days
- FOB Ningbo
- US$48.00 – 58.00
- HS code
- 9405.21
- Pieces per carton
- 1
- 40HQ holds
- 700 pcs
- CE
- RoHS
- UL
- SAA
Prices are a guide for the minimum order, FOB, per piece; your quotation is what binds us.
The arc packs in three telescoping sections, which is what keeps the carton under courier length limits.
Specifications
| Height | 2,050 mm |
|---|---|
| Reach | 1,800 mm |
| Base | 300 × 300 mm marble, 14 kg |
| Lamp holder | E27, max 60 W |
| Switch | Foot switch |
| Plug | EU / UK / US / AU |
| HS code | 9405.21 |
| Certificates | CE, RoHS, UL, SAA |
Packing & loading
- Carton
- 118 × 30 × 26 cm
- Pieces per carton
- 1
- Volume
- 0.092 m³
- Gross weight
- 16.8 kg
- Inner packing
- Marble base in its own carton, arm and shade in a second
- Cartons
- –
- Volume
- –
- Gross weight
- –
- Containers
- –
–
Cartons kept upright; a quarter-turn row fills the space left at the doors. Real stuffing varies by a few percent.
| Container | Cartons | Pieces | Volume used |
|---|---|---|---|
| 20GP | 279 | 279 | 78% |
| 40GP | 630 | 630 | 86% |
| 40HQ | 700 | 700 | 85% |
What we can change for you
- Base (marble
- steel)
- shade finish
- plug type for your market
Terms
- Incoterms
- FOB, CIF, CFR, EXW, DDP
- Payment
- T/T 30% deposit, 70% against copy of B/L · L/C at sight
- Samples
- Stock samples in 3–5 days, free up to three models; you pay the courier. Custom samples in 10–15 days, refunded on a first order.
- Warranty
- 3 years on LED products, 2 years on everything else; 1% free spares with every container.
More table & floor lamps
TW-T3306 · Table & floor lamps
Architect desk lamp, LED
MOQ300 pcs Lead time30–35 days FOBUS$14.50 – 17.00
Add to inquiryIn your inquiry
TW-B1256 · LED filament bulbs
G125 globe filament bulb, 6 W
MOQ2,000 pcs Lead time20–25 days FOBUS$1.35 – 1.60
Add to inquiryIn your inquiry
TW-P2310 · Pendant lights
Enamel factory pendant, Ø310
MOQ300 pcs Lead time25–30 days FOBUS$11.20 – 13.80
Add to inquiryIn your inquiry
TW-C0808 · Chandeliers
Crystal dining chandelier, 8 lights
MOQ20 pcs Lead time40–45 days FOBUS$142.00 – 168.00
Add to inquiryIn your inquiry
TW-F7210US$48.00 – 58.00
Add to inquiryIn your inquiry